LumarisConstruction Limited 07000 000000

Construction & Renovation

From the front door to the back fence

We renovate homes inside and out: kitchens, bathrooms, tiling, decorating, electrics, gardens and patios. One team, one quote, one point of contact.

Finished oak slat wall with LED strips and wall-mounted TVMedia wall · finished
Front garden laid in grey porcelain with plantersFront garden · porcelain
Interior renovationKitchensBathroomsTiling & flooringDecoratingElectricalGardens & patios

What we do

Build it, finish it, hand it over

From stripping a room back to the brick to the last coat of paint, our own team handles each trade in the right order, so nothing has to be redone.

Inside Rooms

Interior renovation

Full room makeovers, strip-outs, plastering, wall panelling and slat walls, built-in shelving and storage.

Kitchens

Supply and fit, quartz worktops, built-in appliances, splashbacks, floors and lighting.

Bathrooms & WCs

Full refits, freestanding baths, wall-hung toilets and vanities, niches and large-format tiling.

Decorating

Painting, feature wallpaper, full-wall murals, new doors, skirting and coving.

Floors, power & outside Trades

Tiling & flooring

Wall and floor tiling, patterned and tumbled-stone tiles, laminate and wood floors.

Electrical

Rewires, consumer units, extra sockets, downlights and LED feature lighting, outdoor lights.

Gardens & landscaping

Artificial grass, sub-base and drainage, raised beds, fencing and planting.

Patios & paths

Porcelain and stone patios, front paths, ground lights, jet-wash and patio restoration.

Drag the slider

Before & after

Real photos from our jobs. Drag the white handle left and right to compare the same space before and after the work.

Garden before: bare soil and old patio Garden after: new artificial lawn BeforeAfter
Rear garden, soil to lawnCleared, sub-base laid and levelled, finished in artificial grass.
Laying course being spread over the sub-base Laying course compacted flat and level SpreadingLevelled
Laying course, spread to levelGranite dust raked out, wetted and compacted ready for the grass.
Living room wall stripped back with new wiring for lights and TV 3D design of the same wall with oak slat panels and floating TV unit Stripped back3D design
Living room, TV wallWalls stripped and rewired for downlights, speakers and the TV. Slide to see the agreed 3D design.
Kitchen worktops being fittedFitting day
Fitted kitchen with grey shaker units and built-in ovensFitted
KitchenShaker units, quartz worktops, built-in AEG ovens, hexagon marble-effect floor and new downlights.
Patio slabs halfway through jet washing Half cleaned
Patio jet washMid-clean: the slabs at the top are untouched, the lower area is done.

Recent jobs

Our work

Photos from homes we've worked on, finished and in progress. Filter by the type of job.

Front garden in grey porcelain slabs with plantersFinished
Front gardenLarge-format grey porcelain, ground lights and planters.
Grey shaker kitchenFitted
Kitchen refitShaker units, quartz worktops, hexagon floor tiles.
Bathroom with book-matched marble-effect tiles and freestanding bathFinished
BathroomBook-matched large-format tiles, freestanding bath, wall-hung vanity.
Football wall mural in a child's bedroomFinished
Kids' bedroomFull-wall football mural, painted feature wall, new oak door.
Cloakroom with tumbled stone-effect tiles and wall-hung toiletFinished
Cloakroom WCTumbled stone-effect tiles, recessed niche, concealed cistern.
Kitchen walk-roundVideo from fitting day.
Tumbled stone-effect floor tiles in a hallwayIn progress
Hallway floorTumbled tiles running through into the WC.
Grey damask feature wallpaperFinished
Feature wallpaperDamask wall, pattern-matched floor to ceiling.
Geometric patterned floor tiles with levelling clipsIn progress
Patterned floorGeometric tiles with border, laid with a levelling system.
Electrician running cables for ceiling downlights and speakersIn progress
First-fix wiringCables run for downlights and ceiling speakers before plastering.
Tumbled stone-effect wall tilesIn progress
Feature wall tilingStone-effect tiles laid vertically.
Living room stripped for renovationBefore
Living room, beforeOld wallpaper stripped, ready for rewiring and plastering.
Football mural seen from the room cornerFinished
Mural, corner viewMural wrapped round to the door frame.

Project · rear garden

How we built this lawn

A lawn that stays flat and drains well is mostly about what goes underneath. These are the stages on a recent job, photographed as we went.

01

Clear & dig out

Old turf, roots and soil removed to depth, edges cut back along the fence line.

Garden cleared down to soil
02

Weed membrane

Heavy-duty membrane laid across the whole area and tucked under the gravel boards.

Overlaps 150 mm minimum

Weed membrane laid with sub-base going down
03

Sub-base

MOT Type 1 crushed stone tipped, raked out and compacted with a plate compactor.

Type 1 · compacted in layers

Piles of MOT Type 1 sub-baseSub-base raked level
04

Laying course

Granite dust spread over the stone, wetted and compacted to a smooth, level finish with a slight fall for drainage.

Granite dust spread over sub-base
05

Grass & lighting

Artificial grass rolled out, joined, pinned and brushed up. Fence lights wired in for the evenings.

Finished lawn lit at night

Cross-section

What's under the grass

A typical build-up for artificial grass on a domestic garden. Depths change with the ground; we check on site and confirm them in your quote.

Artificial grass30–40 mm pile Granite dust20–25 mm, compacted MOT Type 150–75 mm, compacted Weed membrane Existing ground

Interiors

See the room before we build it

For bigger rooms we produce a 3D design first, so you can agree colours, lighting and joinery before any work starts. Then we build it.

Pictures marked "3D design" are design visuals prepared for clients. Pictures marked "Finished job" are photos of completed work.

Working with us

Four steps, one team

You deal with the same people from the first visit to the final check.

Step 1Site visit

We come and measure, look at access, power and drainage, and listen to what you want.

Step 2Design & quote

A written quote broken down by job. For interiors, a 3D design to sign off.

Step 3Build

Agreed start date, a tidy site and progress photos sent as we go.

Step 4Handover

We walk round the finished job with you, put right anything you spot, and stay on call afterwards.

Free quote

Tell us about your project

Send a few details and some photos of the space. We reply within one working day.

Phone / WhatsApp07000 000000
Emailinfo@lumarisconstruction.co.uk
Areas coveredLondon & surrounding areas